Cutover cabling, on time.

Cutovers and migrations happen in a fixed maintenance window. A wrong length or a missing assembly can blow the whole window. This is how to keep cable off the critical path.

The problem with normal lead times

Custom assemblies typically quote 1–3 weeks through traditional distribution — longer than most cutover schedules allow, and far longer than the "we found three more racks" surprises that appear the week before. When the cable can't arrive inside the window, the migration slips.

How to keep cable off the critical path

  1. Quote from a BOM instantly. Upload your list on the quote page and get pricing in minutes — no sales call, no account.
  2. Order exactly what the window needs. Any length, any quantity, no minimums, so late additions are trivial.
  3. Build and ship in about 2 business days. Most custom orders leave the facility inside two business days, double-tested.
  4. Keep a fast supplier pre-qualified. Approve a secondary source before the window so a slip becomes a same-week fix, not a reschedule.

What you can get quickly

Fast turnaround covers the whole catalog — LC/SC/ST/MPO/MTP fiber jumpers and trunks in OS2 or OM3/OM4, and Cat5e–Cat8 copper patch cords, custom length, color, and jacket rating. Standard builds are TIA-568 compliant and carry a lifetime warranty, so there's no installation risk added to an already tight night.

Cutover this week?

Upload your BOM for an instant estimate now. Most orders build and ship in about 2 business days.

Get an Instant Estimate → Urgent Orders Guide